29. Construction for Fresh-cutting Flowers Industrilization Demonstration Base in Zhangzhou

I. Project, construction scale and location: The project plans to build the new intelligent greenhouse with shading system, cooling system, power supply circuit and equipment, water supply and drainage system and other supporting facilities. The project is suggested to be located in Changtai County and its planned land covers an area of 1000 m***

II. Construction reasons and conditions: The international competitiveness of Zhangzhou fresh-cutting flower industry is growing and its competitive advantages in the main export target markets is increasing but it does not have the competition strength against the urban areas with the developed flower industry due to its weak breeding, R&D and other relevant supporting industries. Therefore, the construction of the project is the need in the market development.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment50 million RMBV. Project economic and efficiency analysis: Predicted annual value of production 1.5 billion RMB.

VI. Project liaison unit: Changtai County Forestry Bureau

Contact: Ma Huachun

Tel1351595***

 

30. Zhaoyang Reservior Construction Engineering in Zhangpu

I. Project, construction scale and location: The project will construct a reservoir with a total capacity of 43.81 million cubic meters and its highest dam is 95m high. The elevation of the normal water storage level is 190 meters and its capacity under the normal water storage level is 40.21 million cubic meters. The installed power-generating capacity of the power station behind the dam is 2×2500 kilowatts and the guaranteed irrigation area of the reservior is about 50000 mu. The project is suggested to be located in Meilin Village, Nanpu Township, Zhangpu County.

II. Construction reasons and conditions: After the completion of the reservior, the guaranteed irrigation area of the Zhaoyang irrigation area can be increased 50000 mu to solve drinking water problem of 300000 people in the county and the surrounding townships and towns.

III. Preliminary work of the project: The project is under the feasible demonstration.

IV. Project total investment1 billion RMBV. Project economic and efficiency analysis: The project belongs to the infrastructure project without economic benefits.

VI. Project liaison unit: Zhangpu County Bureau of Ocean and Fishery

Contact: Xu Qiusheng

Tel1360755***

 

31. Famous and Excellent Aquacuture Demonstration Base in Zhangpu

I. Project, construction scale and location: Develop the famous and excellent aquaculture in Jiuzhen Bay, Fotan Bay and Shaxi Aquiculture area with a total area of 100000 mu. The project is suggested to be located in Zhangpu County.

II. Construction reasons and conditions: Develop the environmentally friendly, resource-saving and healthy aquaculture industry and promote the formation of the modern aquaculture system with standardization, scale and industrialization.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment120 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 300 million RMB.

VI. Project liaison unit: Zhangpu County Water Conservancy Bureau

Contact: Zheng Zhijian

Tel1800695***

 

32. Establishment of the Key Ecological Public-welfare Forest Reserve in Yunxiao County

I. Project, construction scale and location: Buy 14000 mu of the commercial forests in the region and project is suggested to located in Yunciao County Forestry Bureau.

II. Construction reasons and conditions: The constant optimization of the economic structure in the forestry is the material guarantee to realize the sustainable development of the forestry.

III. Preliminary work of the project: The project has finished the preliminary planning.

IV. Project total investment700 million RMBV. Project economic and efficiency analysis: Good investment prospects.

VI. Project liaison unit: Yunxiao County Forestry Bureau

Contact: Zhang Zhiyun

Tel1385924***

 

33. Natural Forest Protection Poject in Yunxiao County

I. Project, construction scale and location: The project constructs the safeguard measures on 154000 mu of the natural forests in the whole county and it is suggested to be located in the whole Yunxiao County.

II. Construction reasons and conditions: The project can improve the ecological environment, recover the forest vegetation, increase the forest resources, improve the forest coverage rate, keep water and soil, conserve the water resources and improve the climate and environment after its completion.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment77 million RMBV. Project economic and efficiency analysis: Efficiently improve the ecological environment.

VI. Project liaison unit: Yunxiao County Forestry Bureau

Contact: Zhang Zhiyun

Tel1385924***

 

34. Boutique Fruits nd Vegetables Plantation

I. Project, construction scale and location: The project is the modern organic fruits and vegetables plantation with the traceability system to provide high-quality food materials for the starred hotels. The project is suggested to be located in Longwen District, covering an area of 500 m***

II. Construction reasons and conditions: The urban families are entering a new stage of the upgrading of the consumption structure and put forward new requirements on the variety, quality and grade of the agricultural products, which provides the market space for the development of the boutique agriculture.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment100 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 600 million RMB.

VI. Project liaison unit: Longwen District Guokeng Town Government

Contact: Guo Qiaomiao

Tel1386086***

 

35. Project for the Electronic Commerce Logistics of Agricultural Products in Zhangzhou

I. Project, construction scale and location: The project is the construction of Zhangzhou Electronic Commerce Logistics Park of Agriculture Products mating with the perfect Zhangzhou cold-chain logistics system. The project is suggested to be located in Longwen District and covers an area of 500 mu.

II. Construction reasons and conditions: As a typical agricultural city, the modern agriculture of Zhangzhou has become the main force of its economic development with the rapid development of the agricultural economy. The project will build the largest electronic commerce logistics platform for the agricultural products in Fujian Province, promote the marketing of the agricultural products to the surrounding areas and radiate Fujian Province, Taiwan and various countries in Southeast Asian.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment320 million RMBV. Project economic and efficiency analysis: Predicted annual value of production 700 million RMB.

VI. Project liaison unit: Longwen District Bureau of Commerce

Contact: Yang Dongli

Tel0596-212***

 

36. Project of Wonderland Modern Agricultural Sightseeing Garden

I. Project, construction scale and location: Relying on the fruit resources in Changshan Overseas Chinese Economic Development Zone, the project will create the first dark night park in Fujian Province and the first Fujian Originally Ecological and Live Experience Park for Returned Overseas Chinese Culture. The project is suggested to be located in Changshan Overseas Chinese Economic Development Zone and covers an area of 2000 mu.

II. Construction reasons and conditions: Changshan Overseas Chinese Economic Development Zone is the national high-quality fruits demonstration base with ten thousands mu for agriculture earning foreign exchanges, where fruit trees make a pleasant shade with aroma in four seasons and has a strong feature of the tropical South Asia. The project will be built into the first dark night park in Fujian Province and the first Fujian Originally Ecological and Live Experience Park for Returned Overseas Chinese Culture.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment900 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 500 million RMB.

VI. Project liaison unit: Tourist Administration of Changshan Development Zone

Contact: Wu Yaqiong

Tel1865965***

 

37. Plant Extract Project with Five-million Annual Outputs

I. Project, construction scale and location: The project will purchase 900 sets/suits of the major production equipment. The project is planned to construct in Pinghe Tianma State-owned Forest Farm and its total site area is 16000 square meters, whose building area is 107400 square meters.

II. Construction reasons and conditions: This project belongs to the forest product deep processing project and its direct finished products, namely various plant extract, have the commercial development value and at present, our country has few enterprises to product so this project fills up the market vacancy.

III. Preliminary work of the project: In the process of preliminary planning.

IV. Project total investment500 million RMBV. Project economic and efficiency analysis: The annual output of various plant extract is 500 tons.

VI. Project liaison unit: Pinghe Tianma State-owned Forest Farm

Contact: Wu Qingquan

Tel1370937***

 

38. Under-forest Economic Plantation Demonstration Project in Hua’an County

I. Project, construction scale and location: The project will develop the under-forest utilization of the under-forest plantation and cultivation, covering an area of 278000 mu. Project location is in Hua’an County.

II. Construction reasons and conditions: Hua’an County contains the greater economic development value due to its advantageous natural resources and the most under-forest economic products are the natural foods due to their original ecological characteristics so the consumer market is wide.

III. Preliminary work of the project: This project has carried out the preliminary feasibility study, the infrastructure is completed at the early stage so the construction of the project has begun to take shape.

IV. Project total investment180 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 900 million RMB.

VI. Project liaison unit: Hua’an County Forestry Bureau

Contact: Chen Xiangdong

Tel1360507***

 

39. Integrated Demonstration Area of the Tea Industry Transformation and Upgrading

I. Project, construction scale and location: This project will construct the integrated demonstration area of the tea sightseeing and deep processing. The site selection of the project is Xiandu Town, Hua’an County with 6000mu land.

II. Construction reasons and conditions: The construction of this project is conducive to promote the transformation and upgrading of the tea industry, enhance the aggregation effect of the tea industry, optimize the industrial structure and promote the development of the tea plantation in the whole county.

III. Preliminary work of the project: The project is planning and designing the Oho Dragon Apex, Fujian Xiangxin Tea Co., Ltd, Xinghe Tea Specialized Cooperatives and Junyun Tea Industry Co., Ltd to construct the tea-plantation demonstration place for leisure and sightseeing tour.

IV. Project total investment80 million RMBV. Project economic and efficiency analysis: The project can bring 100 million yuan of the economic benefits in a year.

VI. Project liaison unit: Hua’an County Agricultural Bureau

Contact: Chen Zhicong

Tel1379982***

 

90. Construction Project of the Modern Industrial Park about Health Maintenance and Old-age Pension by Traditional Chinese Medicine

I. Project, construction scale and location: This project will be constructed into a modern industrial park about health maintenance and old-age pension integrated with planting, processing and tour and sightseeing. The site selection of the project is Neifeng Village, Qiaodong Town, Zhao’an County, covering a total area of 2000 mu.

II. Construction reasons and conditions: The construction party of the project will regard dendrobium officinale planting in imitating wild conditions under the Longan Tree as the main business and comprehensively promote the base construction and drive the development of other industries under its radiation. Adjacent to the county, the project is convenient for people in the urban and surrounding areas to go sightseeing with leisure, which not only can create economic benefits but also can obtain the good social benefits.

III. Preliminary work of the project: The project has finished the handover of the lands, which is leveling, and part construction of the round hill roads; the overall design, plane graph and approval of the environmental protection and other procedures of the project have been completed.

IV. Project total investment200 million RMBV. Project economic and efficiency analysis: Good investment prospects.

VI. Project liaison unit: Zhangpu County Yangji Gardening Co., Ltd.

Project contact: Chen Jiadong

Tel1500600***

Fax0596-331***

Mailbox: zaqdjmb**[ta]**.com

 

Service

 

91. Southern Fujian Agricultural E-commerce Service Center in Zhangzhou

I. Project, construction scale and location: This project will construct the agricultural product service center, the agricultural product E-commerce operating center, the new media operating center, the financial service center, the brand exhibition hall, the modern agricultural warehouse, the inspection and quarantine center, the special agricultural products distribution network and the after-sales service center. The site selection of the project is Shange Town, Pinghe County.

II. Construction reasons and conditions: As a large agricultural county, the whole Pinghe County has over 800000 mu of fruits planting area so it is necessary to develop professional bulk product logistics information service platform and build the modern e-commerce logistics park at present.

III. Preliminary work of the project: It is listed in the industrial development plan Pinghe County and the infrastructure supporting facilities are well matched.

IV. Project total investment100 million RMB Sole proprietorship or joint venture is adoptable.

V. Project economic and efficiency analysis: Strong gathering of the industrial chains, wide irradiation range and good economic benefits.

VI. Project contact enterprise: Pinghe County Development and Reform Bureau Project contact: Zeng Pengcheng

Tel0596-521***

Telephone number1396009***

Fax0596-523***

E-mailfgj-ph**[ta]**.com

 

42. Pinghe Modern Cold-chain Logistics Base

I. Project, construction scale and location: This project will construct the frozen area, refrigeration block, processing area and package area for the agricultural and sideline products as well as the logistics information management center. The site selection of the project is Xiaoxi Town, Pinghe County.

II. Construction reasons and conditions: As a large agricultural county, the whole Pinghe County has over 800000 mu of fruits planting area so the development of the Zhangzhou fruits and vegetables storage industry can protect the market price of crops in Fujian Province, reduce the economic loss in the process of the production and sales of agricultural products and promote the strategic adjustment of Zhangzhou agricultural structure.

III. Preliminary work of the project: It is listed in the industrial development plan Pinghe County and the infrastructure supporting facilities are well matched.

IV. Project total investment300 million RMB Sole proprietorship or joint venture is adoptable.

V. Project economic and efficiency analysis: The annual sales revenue is expected to reach 1.3 billion yuan.

VI. Project contact enterprise: Pinghe County Bureau of Commerce Project Contact: Lan Zhengkun

Tel0596-521***

Tel1360698***

Fax0596-523***

E-mailphxwjj**[ta]**.com

 

43. Zhangzhou Rehabilitation Therapy and Human-body Exoskeleton Equipment Industrialization Base

I. Project, construction scale and location: This project will construct the rehabilitation therapy and exoskeleton equipment industrial park, rehabilitation instrument and exoskeleton equipment research and development base, rehabilitation medical apparatus and instrument storage and logistics base, experience exchange center of the rehabilitation medical apparatus and instrument, marketing promotion center and after-sale service center. This project’s planning land is 60 mu and the total building area is 100000 square meters. The site selection of the project is Shetou High and New Technology Industrial Park.

II. Construction reasons and conditions: The field involved in this project is the key field in the modern service industry in Fujian Province with good prospects for development.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa.200 million RMBV. Project economic and efficiency analysis: Single project output intensity 5 million RMB/mu; revenue100,000 RMB/mu.

VI. Project liaison unit: Zhangzhou Taiwan Businessman Investment Zone Economic Development Board

Project contact: Li Tingting

Tel: 677***

1359965***

E-mall: Address: 48736133**[ta]**com

 

44. Establish National 5A Scenic Spot Project in Fujian Tulou (Hua’an) Tourist Area

I. Project, construction scale and location: This project will construct the Tulou culture park, featured tourism commodity city, the Gaoshan Nationality folk culture village, four-star tourist hotel and other supporting facilities. The project is located in Xiandu Town Hua’an Count***

II. Construction reasons and conditions: Fujian Tulou (Hua’an) Tourist Area is the world cultural heritage as well as the national 4A scenic area and it has been completed the preliminary development integrated with tour, sightseeing, taste and entertainment.

III. Preliminary work of the project: In the process of business negotiation.

IV. Project total investment300 million RMBV. Project economic and efficiency analysis: This project can increase 200 million yuan of tourism revenue for Huaan every year after put into operation.

VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Yang Binglin

Tel1385924***

Fax: 736***

E-mailhaxfgj**[ta]**.com

 

45. E-commerce Industrial Park of Hua’an Economic Development Zone

I. Project, construction scale and location: This project will construct 10000 square meters of the e-commerce trading center, 50000 square meters of logistics and storage, 6000 square meters of the parking lot and other supporting facilities. The site selection of the project is Hua’an Economic Development Zone.

II. Construction reasons and conditions: This project will be integrated with the e-commerce platform service, logistics network platform and the actual logistics enterprises after introduction to achieve the online and offline union of the production enterprises, logistics industry and e-commerce.

III. Preliminary work of the project: In the process of business negotiation.

IV. Project total investment400 million RMBV. Project economic and efficiency analysis: The output value will not lower than 200 million yuan in the next year after the project is put into operation and reach 1 billion yuan in five years.

VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Yang Binglin

Tel1385924***

Fax: 736***

E-mall: haxfgj**[ta]**.com

 

46. Integrated Project for Fujian·Nanjing Tulou Film and Television Base Tourism

I. Project, construction scale and location: This project will construct the large-scale comprehensive tourism area by regarding the film and television shooting and tourism as the principal, integrated with the film and television tourism, relax on holidays and sightseeing. The floor space of the project is 500 mu.。The site selection is Shuyang Town and Meilin Town of Nanjing Count***

II. Construction reasons and conditions: This project can expand the brand influence and visibility of Nanjing Tulou after its completion.

III. Preliminary work of the project: This project will attract all kinds of films, micro films and MVs of songs to shoot here and attract tourists to travel in the integrated area of the film and television base tourism every yea***

IV. Project total investment100 million RMBV. Project economic and efficiency analysis: As the important sector of Tulou Travel, create Fujian·Tulou Film and Television Base to expand popularity and increase earnings.

VI. Project liaison unit: Nanjing County Shuyang Town People’s Government Project contact: Zhang Dexing

Tel1360699***

Fax: 777***

E-mall: zhang.d.x**[ta]**.com

 

47. Leisure and Sightseeing Tea Park with Nanjing Gaoshan Nationality Ecological Tourism

I. Project, construction scale and location: This project will build the leisure and sightseeing tea park with the Gaoshan Nationality ecological tourism integrated with sightseeing tea park, tea-picking experience area, tea ceremony exchange area, scientific research on tea area and Goashan Nationality living area. The project covers an area of 800 mu (mostly mountain) and the site selection is Shuyang Town and Meilin Town of Nanjing County.

II. Construction reasons and conditions: Based on Tulou tourism resources and Gaoshan Nationality ecological tea plantation industry, this project develops the leisure and sightseeing tea park with Gaoshan Nationality ecological tourism.

III. Preliminary work of the project: Three connections and one leveling, to be negotiated.

IV. Project total investment200 million RMBV. Project economic and efficiency analysis: As the important sector of Tulou Travel, create the leisure and sightseeing tea park with Gaoshan Nationality ecological tourism to increase earnings.

VI. Project liaison unit: Nanjing County Shuyang Town People’s Government Project contact: Zhang Dexing

Tel1360699***

Fax: 777***

E-mall: zhang.d.x**[ta]**.com

 

項(xiàng)目合作:18361148798    或 點(diǎn)擊這里給我發(fā)消息
溫馨提示:本站提供免費(fèi)發(fā)布服務(wù),但對信息的合法性、實(shí)時性、真實(shí)性和完整性,不承擔(dān)任何責(zé)任。名錄資源由會員為向全球展示品牌形象上傳,個人信息均經(jīng)處理后發(fā)布,如有遺漏戓涉嫌侵權(quán)他人及不愿展示形象的,請將“該頁網(wǎng)址和需修改及刪除的內(nèi)容”發(fā)至本站郵箱戓留言給我們處理。凡注冊會員并發(fā)布信息或名錄資源的,均可定期獲得全球項(xiàng)目參考及合作機(jī)會。本站名錄資源概不對任何第三方開放,更不提供如交換、出售及查詢等服務(wù)!
項(xiàng)目合作及建議請留言:請理性留言,并遵守相關(guān)規(guī)定
姓名: 手機(jī): QQ號: 微信: 郵箱:
驗(yàn)證碼 點(diǎn)此換一張
關(guān)于我們 招商培訓(xùn) 代理招商 代理投資 代理融資 代理政策 戰(zhàn)略伙伴 服務(wù)外包
廣告報價 匯款方式 合作方式 免費(fèi)發(fā)布 網(wǎng)群建設(shè) 誠聘英才 網(wǎng)站導(dǎo)航 設(shè)為首頁